Most arguments on a bathroom refit start with something nobody could see when the quote was written: a rotten floor under the old bath, or pipework that has to be rerouted. Quote everything you can measure as a fixed line, and put a named allowance with a rate against the things you cannot. Write down who is buying the suite and tiles, and say on the quote how the electrics will be signed off and where the waste is going.
Split the quote into lines the customer can follow
A single figure for "bathroom refit" gives the customer nothing to compare and gives you nothing to point to when the job changes. Lines like these work for most refits.
| Line | What it covers | Fixed or allowance |
|---|---|---|
| Strip-out and waste | Remove the old suite, tiles and boarding, and take the waste away | Fixed |
| First fix plumbing | New supply and waste pipework to the positions on the plan | Fixed |
| Electrics | Lighting, extractor fan and shaver point, with testing and certificates | Fixed |
| Walls and floor | Boarding, levelling and waterproofing the shower area | Fixed |
| Tiling | Walls and floor, with the area in square metres written on | Fixed |
| Fit and second fix | Bath or shower, basin, WC, taps, and sealing | Fixed |
| Floor repairs | Replacing damaged boards or joists found after strip-out | Allowance |
| Hidden pipework | Rerouting or replacing pipes found in poor condition | Allowance |
Optional extras, such as a heated towel rail or underfloor heating, go on as separate lines the customer can tick or leave. Separate lines also give a customer who is over budget something to drop other than the whole quote.
Put an allowance against what you cannot see
An allowance is a sum written on the quote for work that may or may not be needed, with the rate it will be charged at. "Floor repairs: allowance of one day at the day rate plus materials, charged only if needed" tells the customer what could happen before it happens.
Agree on the quote what you will do when you find something: stop, show the customer, and confirm the extra in writing (a text or email is enough) before you carry on. If the allowance is not used, it comes off the final invoice, and saying so on the quote makes the line easier to accept.
Write down who supplies what
Some customers buy their own suite and tiles, which causes trouble when a part is missing or the wrong size on the day you need it. The quote should say:
- Which items the customer is buying, and by when they must be on site.
- That your price assumes the items arrive complete and undamaged, and how waiting time will be charged if they do not.
- Which items you are supplying, so there is no doubt about what the materials figure covers.
If you supply everything, the materials can be a large part of the price, and that is what the deposit should cover. The guide to deposits and payment schedules sets out a schedule tied to stages the customer can see, and the cancellation rules that apply when a job is agreed in the customer's home. On a refit, a natural middle stage is when first fix is done and the walls are boarded.
Electrical work in a bathroom is notifiable
In England, adding a new circuit, or altering an existing circuit in the space around a bath or shower, is notifiable under Part P of the Building Regulations, as is a new consumer unit. Most repairs, replacements and maintenance are not. That is according to the Planning Portal's guidance on electrics, checked on 16 November 2026. The rules are different in Wales, Scotland and Northern Ireland.
- An electrician registered with a competent person scheme can self-certify the work. They give the homeowner an Electrical Installation Certificate, and the homeowner should get a Building Regulations Compliance Certificate within 30 days.
- If the person doing the work is not registered, the building control body or a registered third-party certifier has to be notified before the work starts.
If you are a plumber or builder and the electrics go to someone else, name them on the quote, or say plainly that the electrics are not included. Either way, the customer knows before they sign who is responsible for the certificates.
Check the waste is legal
Check how your waste carrier registration treats strip-out waste. According to the Environment Agency's public register, checked on 16 November 2026, a business that carries construction or demolition waste is an upper tier waste carrier, even when the waste is from its own jobs. GOV.UK's registration page says upper tier registration has to be renewed every three years, and you can get an unlimited fine for not registering. Those pages cover England; Wales, Scotland and Northern Ireland have their own registers.
If you use a skip and it goes on the road, it needs a permit from the council. In most areas the skip hire company gets it, but in some you have to apply yourself (GOV.UK: skip licence, England and Wales, checked on 16 November 2026). Put on the quote whether the skip is included and who is arranging the permit.
Say what happens if you find asbestos
Older bathrooms can have asbestos in textured ceilings, floor tiles or boxing. Say on the quote that the price assumes there is none, and that if you suspect any, work on it stops until it has been tested and you have agreed a new price for dealing with it. The Health and Safety Executive's asbestos pages cover what trades must do, including task sheets for work that does not need a licence.
Where software helps
A refit quote has more moving parts than most: optional extras, allowances that may or may not be used, a deposit and a stage payment. Software that supports optional lines on quotes, deposits and multi-day jobs lets you send it as one quote the customer accepts online, then raise each stage invoice from it without retyping. Our software list shows which tools say they handle each of those.
Before your next bathroom quote goes out
- Break your quote template into the lines above, with the tiled area written in square metres.
- Add allowance lines for floor repairs and hidden pipework, with the rate and "charged only if needed".
- Add a "supplied by" column, and a sentence on what happens if customer-supplied items arrive late or incomplete.
- Say who is doing and certifying the electrics.
- Add an asbestos line, check your waste carrier registration is upper tier, and say on the quote who arranges the skip permit.