Give a fixed price when you can say with confidence how long a job will take, and a day rate when you cannot. Swapping a boiler like for like is a fixed price. Tracing an intermittent fault in an old house, or clearing a garden where nobody knows what is under the brambles, is a day rate. Either way, the number underneath should be the same: what one day of your team costs to run, plus what you want to earn on top.
Start with what a day costs you
A day rate that is a guess, or copied from someone else, can be wrong in either direction without you knowing. Work yours out from your own costs.
Add up a year of running the business. Include what you pay yourself, because if you leave it out the business is not paying you. Then divide by the days you can actually bill, which is far fewer than five days a week for 52 weeks.
Here is a worked example for a two-person team, say a builder and a labourer. The figures are made up to show the method, not a guide to what anyone should charge, and they leave out VAT.
| Cost for the year | Example |
|---|---|
| What you pay yourself | £32,000 |
| Your employee, with employer costs | £30,000 |
| Van: finance, insurance, tax, servicing | £8,000 |
| Fuel | £5,000 |
| Tools, plant hire, repairs and replacements | £4,000 |
| Public and employer's liability insurance | £1,500 |
| Phone, software and accountant | £2,500 |
| Tip fees and waste | £3,000 |
| Total | £86,000 |
Every trade weights these lines differently. A tree surgeon paying off a chipper and stump grinder carries a much bigger machinery line, and an electrician or plumber working alone has no employee line but pays for scheme membership, test equipment and van stock that does not always get charged back to a job. Put your own figures in.
For billable days, start from 260 weekdays and take off holidays and bank holidays (say 28 days), days lost to weather or gaps between jobs (say 20, fewer if you work indoors), and days spent quoting, servicing kit and doing paperwork (say 20). That leaves 192 billable days.
£86,000 divided by 192 days is about £448. That is what a day costs before you make any profit at all.
Add your margin
Profit comes on top. One way to set it is to decide what share of the price should be profit and divide by what is left. For a 15% margin, divide the day cost by 0.85: £448 ÷ 0.85 is about £527, so call it £530 a day for the two of you in this example. Over an eight-hour day, that is a little over £66 an hour for the pair.
Every fixed price should be checked against that number.
When to give a fixed price
Fixed prices suit work you can measure and have done before: a like-for-like boiler swap, the board swap part of a consumer unit change with remedial work priced separately, a stud wall of known size, a turf lay on prepared ground. Estimate the days, multiply by your day rate, and add materials.
Using the example rate, fitting a run of kitchen units you expect to take a day and a half is 1.5 × £530, which is £795, plus any materials you supply. Tip fees are already in the day cost, so ordinary waste is covered; add a separate line, or a skip, only when a job produces far more than usual.
A fixed price lets the customer know the total before they agree. You carry the risk if it runs over, so build in a margin for the things that usually slow you down.
When to use a day rate
Day rates suit work where the unknowns are real: fault-finding, opening up old floors and ceilings, groundwork, site clearances, storm damage, anything where the job changes once you start. Give an estimate of the number of days and say what would make it longer. "Two to three days at the day rate, depending on what we find under the floor" is honest, and it stops the argument that comes when a fixed price has to change.
A mixed approach often works on bigger jobs: a fixed price for the parts you can measure, such as tiling a bathroom or laying a patio, and a day rate for what you cannot see until you start, such as the floor under the old bath or the groundwork before the patio.
Pricing regular visits
For regular visits, such as mowing rounds, window cleaning or annual boiler services, price each visit from the time it takes plus its share of travel. As a second example, take a solo operator whose day cost, worked out the same way, comes to £280 for eight hours. That is £35 an hour. A lawn that takes 35 minutes on site, plus around 10 minutes of driving, is 45 minutes: about £26 a visit. A boiler service that takes an hour, plus 20 minutes of driving, is 80 minutes: about £47 before parts.
Set a minimum visit charge, so small jobs at the edge of your area still cover the drive.
Work out your own number
Take an evening this week and work out your own day cost, using last year's bank statements rather than memory. Then check your last five quotes against it. If some came in below your day cost, you now know which kinds of job to price differently.
For the way a priced job should be laid out on a quote, read how to quote a bathroom refit or how to quote a tree removal.